Plain-English definitions of the accounting terms that come up when you build pools for a living.

Draw schedule

A draw schedule lists the payments a customer makes as the pool reaches set milestones. A typical one runs deposit, excavation, steel, gunite, tile and coping, then plaster. Each draw is meant to pay for the work it is tied to. The trouble starts when the costs come due before the draw does.

Job costing

Job costing means charging every cost to the job that caused it. Materials, subcontractors, labor and permits all land on a specific contract. That gives you a margin for each pool, not just one number for the whole company. Without it, a losing job hides inside a good month.

WIP schedule

A WIP (work-in-progress) schedule is a monthly report with one line per open job. It shows the contract price, estimated total cost, cost to date, percent complete and amount billed. From those it tells you whether each job is overbilled or underbilled. It is the earliest warning you get that a job is drifting.

Percentage-of-completion

Percentage-of-completion is a way to count revenue as a job progresses instead of all at the end. Percent complete is usually cost to date divided by estimated total cost. Earned revenue is the contract price times that percent. Smaller builders can often use the completed-contract method for taxes instead. The WIP math still matters for managing cash.

Overbilling

Overbilling means you have billed a job for more than the work done so far has earned. The cash came in ahead of the work. It is not profit. It is money you still owe the customer in finished work. Spending it on other jobs is how a busy builder ends up short.

Underbilling

Underbilling means you have done more work on a job than you have billed for. You are paying for the customer's pool out of your own cash. It shows as an asset on paper, but it is money out the door. Bill the draw as soon as the milestone is reached.

Deposit commingling

Deposit commingling is using one customer's deposit or draw to pay costs on a different job. Florida law does not require a separate account for each job. It does require that a payment on a job go first to what that job already owes. Mixing every job's money together makes that easy to get wrong. See Florida Statute 713.345.

Lien waiver

A lien waiver is a signed statement from a subcontractor or supplier that they have been paid. In it they give up their right to file a lien on the property for that amount. Collect one with every payment. If you don't, the homeowner can be asked to pay twice, and that problem comes back to you.

Retainage

Retainage is a percentage of each payment held back until the job is finished. Five to ten percent is common. It shows up more in commercial work than in residential pools. When you have it, track it by job, because it is cash you have earned but cannot spend yet.